(Giàn BR-A Malay)Engineering, Procurement, Construction, Installation and Commissioning

petroC

Moderator
Thành viên BQT
Tài liệu về giàn BR-A
Engineering, Procurement, Construction, Installation and Commissioning .


BR-A CPP is a process platform which is bridge linked with BR-B WHRP, Phase 2, will
accommodate all the hydrocarbon processing equipment, all the production support including
separation, gas dehydration, gas compression, metering & crude export facilities, utility systems
and essential accomodation. The production facilities will be designed to produce 320 MMSCFD
sales gas (300 MMSCFD sales gas for export to Malaysia and Vietnam via dedicated pipelines
and 20 MMSCFD for gas lift) and 60,000 STBPD stabilised crude oil for export to FSO.
All the wellhead riser platforms (BK-A, BK-C, BR-B, BR-C & BS-A) which are included under
different phases of the project and mobile offshore applications barge (BR-D platform, as part of
East Raya development) are tied into BR-A platform either directly or via BR-B wellhead riser
platform (WHRP).
Although every effort has been made to ensure accuracy and completeness within this document,
it has been assumed that experienced and skilled personnel will perform all activities described
herein. In the event of any queries KPE/HHI should be contacted immediately. No part of this
document shall be understood to overrule or supersede the operators or main contractors safety
procedures.
This document shall be dealt herewith the following companies abbreviations:
Talisman Malaysia Limited (Owner) – TML
Hyundai Heavy Industries Limited (Contractor) – HHI
Kvaerner Petrominco Engineering Sdn. Bhd. (Design Engineering Consultant) – KPE
 

Đính kèm